Skip to content

Home /Engineering /Sprint Planning

The team spends the first hour of sprint planning figuring out what they're working on.

Jira automation that grooms the backlog, calculates capacity, flags dependencies, and drafts the sprint plan before planning starts. You approve the plan; the team walks into planning to decide priorities, not rediscover what’s there.

~4 hrs/sprint back to you · backlog groomed, capacity calculated, plan drafted before planning

Three steps per sprint.

Managed service. We do the setup, the agent orchestration, the exception handling. You own the decisions.

Step 1

Agents groom the backlog before planning.

Pulled from Jira, Linear, GitHub Issues, or wherever your tickets live. Stale tickets archived, missing acceptance criteria flagged, dependencies surfaced, prior commits checked against the same epics.

Step 2

Agents calculate capacity and draft the sprint plan.

Velocity history, planned PTO, on-call rotations, dependencies on other teams, capacity computed per engineer. A draft sprint plan proposed against the priority list, with the trade-offs shown.

Step 3

Your engineering manager approves the plan. Team walks into priorities.

Open the draft, see the proposed scope and the risks. Approve to start the sprint; rework where the data missed. Planning meetings shrink to discussion, not data hunting.

Where the line sits.

Agents run the repetitive work your VP Engineering / Engineering Manager shouldn’t be doing. You stay in charge of the judgment.

Specifically, agents don't:

  • Commit a sprint scope to stakeholders without your engineering manager's approval.
  • Reassign tickets across engineers without flagging the change.
  • Close or archive a ticket without flagging it for owner review.

YOUR DATA STAYS YOURS.

The teammate reads what it needs to do the work, with access scoped to the resources its role requires. The models it reasons with run in Azure environments we operate under Microsoft's enterprise terms, never a public or consumer AI service, and nothing is used to train them.

PRODUCTION-READY ON DAY ONE.

Every deployment includes governance, role-based access control, monitoring, and model management.

Frequently Asked Questions

Yes. Kickoff captures your cadence: 1-week sprints, 2-week sprints, continuous Kanban with capacity reviews. Agents adapt to your rhythm.

Override the capacity number; agents learn the new constraint and recompute. The data is shown alongside, so you see what was missed.

No. Agents sit on top of whichever tracker you use. Your Jira keeps the tickets; agents do the grooming, capacity math, and draft.

Three deployment options: our compliant environment, your cloud, or on-prem. Data stays in the perimeter you pick. Agents read inline to do the work: nothing copied, stored, or used to train models.

Try it on your real work.

Does your team do this differently? Your plan includes one custom workflow, built around how your team actually works.

Building the case for it? See what doing this by hand costs you today.